1 MW Solar operating in Carver, MN — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
44.8464, -93.8477
County
Carver, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Standard Solar | Standard Solar | — |
| Owner(s) | Standard Solar | — | — |
| Status | Operating | operating | — |
The USS King 2 CSG is a 1 MW solar photovoltaic power plant located in Carver County, Minnesota. The plant began operating in 2019 and is owned and operated by Standard Solar. It utilizes a single-axis tracking system to maximize solar energy capture. The plant has one generator.
The USS King 2 CSG operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the MRO NERC region. In its latest year of operation, the plant generated 2,094 MWh of electricity, achieving a capacity factor of 23.8%. The plant ranks 354th out of 540 power plants in Minnesota and 6419th out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
50 MWh
Latest Month
2.1K MWh
Annual Generation
23.8%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match