1 MW Solar operating in Carver, MN — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
44.8393, -93.8823
County
Carver, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Standard Solar | Standard Solar | — |
| Owner(s) | Standard Solar | — | — |
| Status | Operating | operating | — |
The USS Lake Patterson Solar CSG is a 1 MW solar photovoltaic power plant located in Carver County, Minnesota. The plant began operating in 2019 and is owned and operated by Standard Solar. It utilizes single-axis tracking technology to maximize solar energy capture. The plant is interconnected to the Midcontinent Independent Transmission System Operator (MISO) balancing authority.
In its most recent year of operation, the plant generated 2,145 MWh of electricity, achieving a capacity factor of 24.4%. USS Lake Patterson Solar CSG is ranked as the 242nd largest power plant in Minnesota out of 540, and ranks 6473rd nationally out of 7108 plants. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
52 MWh
Latest Month
2.1K MWh
Annual Generation
24.4%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
NSP.MMPA
Pricing Hub
MINN.HUB
Location Type
Load Zone
Node Source
Curated node match