4 MW Solar operating in Riverside, CA — California Independent System Operator
4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2017
Operating Since
Coordinates
33.9704, -117.3310
County
Riverside, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | MN8 Energy LLC | MN8 Energy | — |
| Owner(s) | MN8 Energy LLC | — | — |
| Status | Operating | operating | — |
The UC Riverside Lots 30 & 32 solar photovoltaic plant is located in Riverside County, California. The plant has a total capacity of 4 MW and commenced operations in 2017. It is operated by MN8 Energy LLC. The plant utilizes a single generator and fixed-tilt solar tracking technology.
The plant's primary fuel source is solar energy. In its latest year of reported generation, UC Riverside Lots 30 & 32 produced 6,989 MWh of electricity, achieving a capacity factor of 19.9%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is ranked as the 337th largest solar plant in California out of 862, and 3379th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
344 MWh
Latest Month
7.0K MWh
Annual Generation
19.9%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_SP15_GEN-APND
Node Source
OSM spatial match