200 MW BESS operating in San Bernardino, CA — California Independent System Operator
200 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
34.0205, -117.3324
County
San Bernardino, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Condor Energy Storage LLC | — | — |
| Owner(s) | Condor Energy Storage LLC | — | — |
| Status | Operating | — | — |
Condor Energy Storage LLC is a 200 MW battery energy storage system (BESS) located in San Bernardino County, California. The plant, owned and operated by Condor Energy Storage LLC, began operating in 2024. It is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) region. The facility ranks 69th in size among California power plants and 289th nationally.
The BESS has a total storage capacity of 800 MWh, providing a duration of 4 hours. The battery chemistry is lithium-ion (LIB). The plant consists of a single generator. The primary fuel listed is MWH, indicating that it draws power from the grid to charge the batteries.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−2.4K MWh
Net Charging
-28.9K MWh
Annual Net Energy
-1.6%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
RIVRSIDE_6_N001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match