25 MW Solar operating in Clark, NV — Nevada Power Company
25 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2020
Operating Since
Coordinates
35.8924, -114.9360
County
Clark, NV
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Techren Solar IV LLC | 174 Power Global | — |
| Owner(s) | KKR/GA | 174 Power Global [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as 174 Power Global [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Techren Solar IV LLC is a 25 MW solar photovoltaic power plant located in Clark County, Nevada. The plant began operating in 2020 and has one generator. It is owned and operated by Techren Solar IV LLC. The facility utilizes single-axis tracking to maximize solar energy capture. It ranks as the 30th largest solar plant in Nevada out of 52, and 1316th nationally out of 7108.
The plant's primary fuel source is the sun. In its latest year of reported generation, Techren Solar IV produced 53,892 MWh of electricity, achieving a capacity factor of 24.6%. The plant operates within the Nevada Power Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Financial data indicates a power purchase agreement (PPA) price of $29.32 per MWh.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Nevada Power Company
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
3.0K MWh
Latest Month
53.9K MWh
Annual Generation
24.6%
Capacity Factor
$34.5/MWh
LCOE (Levelized Cost)
$29.3/MWh
PPA Price
$10.7/MWh
Energy Value
Market Position
LMP Node
NSO_2_N008
Pricing Hub
—
BLM to hold public meetings mid-January for proposed 600 MW Jove Solar facility
The large solar facility is part of a 1 GW portfolio of projects proposed for construction on BLM land in Arizona.
BLM to hold public meetings mid-January for proposed 600 MW Jove Solar facility
The large solar facility is part of a 1 GW portfolio of projects proposed for construction on BLM land in Arizona.
Surge in solar energy production on Nevada’s horizon
LAS VEGAS (KLAS) — The four largest solar projects under development in the U.S. are in Nevada — with three in Esmeralda County.
On Becoming Obsolete: How a High-Tech Solar Plant Found Its Way to Bankruptcy
The 10000 mirrors arrayed around the Crescent Dunes Solar Energy plant are striking and seem to suggest the concept is on a path to...
Last updated 2026-03-26
View all 10 articles