25 MW Solar operating in Clark, NV — Nevada Power Company
25 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2020
Operating Since
Coordinates
35.8459, -114.9698
County
Clark, NV
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Techren Solar III LLC | 174 Power Global | — |
| Owner(s) | KKR/GA | 174 Power Global [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as 174 Power Global [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Techren Solar III LLC is a 25 MW solar photovoltaic power plant located in Clark County, Nevada. The plant, which began operating in 2020, utilizes single-axis tracking technology. It is owned and operated by Techren Solar III LLC. The plant is connected to the Nevada Power Company balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, Techren Solar III generated 53,970 MWh of electricity, achieving a capacity factor of 24.6%. Techren Solar III is ranked as the 29th largest solar plant in Nevada out of 52, and 1313th nationally out of 7108. Financial data indicates that the plant has a power purchase agreement (PPA) price of $29.32 per MWh.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Nevada Power Company
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
2.6K MWh
Latest Month
54.0K MWh
Annual Generation
24.6%
Capacity Factor
$34.7/MWh
LCOE (Levelized Cost)
$29.3/MWh
PPA Price
$10.6/MWh
Energy Value
Market Position
LMP Node
NSO_2_N008
Pricing Hub
—
BLM to hold public meetings mid-January for proposed 600 MW Jove Solar facility
The large solar facility is part of a 1 GW portfolio of projects proposed for construction on BLM land in Arizona.
BLM to hold public meetings mid-January for proposed 600 MW Jove Solar facility
The large solar facility is part of a 1 GW portfolio of projects proposed for construction on BLM land in Arizona.
Surge in solar energy production on Nevada’s horizon
LAS VEGAS (KLAS) — The four largest solar projects under development in the U.S. are in Nevada — with three in Esmeralda County.
On Becoming Obsolete: How a High-Tech Solar Plant Found Its Way to Bankruptcy
The 10000 mirrors arrayed around the Crescent Dunes Solar Energy plant are striking and seem to suggest the concept is on a path to...
Last updated 2026-03-26
View all 10 articles