5 MW BESS standby in Travis, TX — Electric Reliability Council of Texas, Inc.
5 MW
Nameplate Capacity
2
Generators
units
Flywheels
Technology
2012
Operating Since
Coordinates
30.2199, -97.7088
County
Travis, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Austin Energy | Austin Energy | — |
| Owner(s) | Austin Energy | Austin Energy | — |
| Status | Standby | — | — |
The System Control Center, located in Travis County, Texas, is a 5 MW energy storage facility owned and operated by Austin Energy. The plant began operating in 2012 and utilizes flywheels as its energy storage technology. It consists of two generators using MWH as its primary fuel source.
The System Control Center operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. In terms of size, the plant is ranked 311 out of 313 facilities in Texas and 958 out of 1205 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
12.7 kV
Regulatory Status
RE
Entity Type
Municipal
Sector
Electric Utility
0 MWh
Net Discharge
0 MWh
Annual Net Energy
0.0%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Grove Substation · 138 kV
Substation Distance
< 10 km
Operator
Austin Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Austin Clean Energy & Battery Announcements Are Major Step Towards Reclaiming Position of Climate Leader
By Shane Johnson, Clean Energy Organizer. Last month, Austin Energy announced several new clean energy programs, and the Austin City Council...
Austin Energy says it needs more time to evaluate exit of large coal-fired plant
Austin's Mayor wants the city out of the Fayette Power Project by January 2029, but the exit could take longer.
Last updated 2026-03-26
View all articles