1.5 MW BESS operating in Travis, TX — Electric Reliability Council of Texas, Inc.
1.5 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2018
Operating Since
Coordinates
30.2656, -97.6881
County
Travis, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Austin Energy | Austin Energy | — |
| Owner(s) | Austin Energy | Austin Energy | — |
| Status | Operating | — | — |
The Kingsberry Energy Storage System is a battery energy storage system (BESS) located in Travis County, Texas. The plant is owned and operated by Austin Energy. It began operating in 2018 and has a total capacity of 1.5 MW. The plant utilizes batteries as its primary fuel source, classified as MWH in energy data.
The Kingsberry BESS consists of a single generator and has a storage capacity of 3 MWh. The battery duration is 2 hours, and the battery chemistry is Lithium Ion (LIB). The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, which falls under the Texas Reliability Entity (TRE) NERC region. In terms of size, the Kingsberry Energy Storage System ranks 313th out of 313 plants in Texas and 1168th out of 1205 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
12.47 kV
Regulatory Status
RE
Entity Type
Municipal
Sector
Electric Utility
−6 MWh
Net Charging
-56 MWh
Annual Net Energy
-0.4%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Kingsbery Substation · 138 kV
Substation Distance
< 10 km
Operator
Austin Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
LZ_AEN
Pricing Hub
HB_SOUTH
Location Type
Load Zone
Node Source
EIA-860 direct report
Austin Clean Energy & Battery Announcements Are Major Step Towards Reclaiming Position of Climate Leader
By Shane Johnson, Clean Energy Organizer. Last month, Austin Energy announced several new clean energy programs, and the Austin City Council...
Austin Energy says it needs more time to evaluate exit of large coal-fired plant
Austin's Mayor wants the city out of the Fayette Power Project by January 2029, but the exit could take longer.
Last updated 2026-03-26
View all articles