2 MW Solar operating in Genesee, NY — New York Independent System Operator
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
43.0199, -78.1555
County
Genesee, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | AES Distributed Energy | — |
| Owner(s) | AES Distributed Energy | — | — |
| Status | Operating | operating | — |
Lichtenthal is a 2 MW solar photovoltaic power plant located in Genesee County, New York. The plant began operating in 2018 and has one generator. AES Distributed Energy is the plant's operator. The facility's primary fuel source is solar (SUN). It uses a fixed tilt solar tracking system.
The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, Lichtenthal ranks 516 out of 695 power plants in New York and 4809 out of 7108 nationally. The plant's latest annual generation was 2,969 MWh, resulting in a capacity factor of 16.9%.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
78 MWh
Latest Month
3.0K MWh
Annual Generation
16.9%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
WESTERN_NY_WIND
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone B
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.