5 MW Solar operating in Bosque, TX — Electric Reliability Council of Texas, Inc.
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
32.0798, -97.7653
County
Bosque, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Owner(s) | Cypress Creek Renewables | — | — |
| Status | Operating | operating | — |
Walnut Springs Solar is a 5 MW solar photovoltaic power plant located in Bosque County, Texas. The plant began operating in 2016 and has one generator. Cypress Creek Renewables is the plant's operator. Walnut Springs Solar utilizes a fixed tilt solar tracking system.
The plant's primary fuel source is solar energy. In its most recent year of operation, Walnut Springs Solar generated 8,445 MWh of electricity, achieving a capacity factor of 19.2%. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. Walnut Springs Solar is ranked as the 263rd largest power plant in Texas out of 298, and 2615th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
22 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
523 MWh
Latest Month
8.4K MWh
Annual Generation
19.2%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Walnut Springs Switching Station · 69 kV
Substation Distance
< 10 km
Operator
Texas-New Mexico Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.