1.9 MW Solar operating in Hampshire, MA — ISO New England Inc.
1.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2012
Operating Since
Coordinates
42.2867, -72.7018
County
Hampshire, MA
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | CleanCapital Holdings | CleanCapital Holdings | — |
| Owner(s) | GLC-(MA) Easthampton, LLC | GLC- (MA) Easthampton LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as GLC- (MA) Easthampton LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
The Easthampton Landfill-City of Easthampton solar photovoltaic plant is located in Hampshire County, Massachusetts. The plant has a total capacity of 1.9 MW and began operating in 2012. It is owned and operated by CleanCapital Holdings. The facility consists of one generator and utilizes fixed-tilt solar tracking technology.
In the most recent year of data, the plant generated 2,855 MWh of electricity, achieving a capacity factor of 17.1%. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. It is ranked as the 277th largest power plant in Massachusetts out of 435, and 5363rd nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
22.9 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
152 MWh
Latest Month
2.9K MWh
Annual Generation
17.1%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Florence Substation · 115 kV
Substation Distance
< 10 km
Operator
National Grid
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.H.INTERNAL_HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.