150 MW Wind operating in Stark, ND — Southwest Power Pool
150 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2016
Operating Since
Coordinates
46.6115, -102.7882
County
Stark, ND
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Brady Wind II, LLC | — | — |
| Owner(s) | Brady Wind II, LLC | — | — |
| Status | Operating | — | — |
Brady II Wind Energy Center is a 150 MW wind power plant located in Stark County, North Dakota. The facility, which began operating in 2016, is owned and operated by Brady Wind II, LLC. It utilizes a single generator comprised of onshore wind turbine technology. Specifically, the plant uses GE1.79-100 wind turbines manufactured by GE Wind, with a rotor diameter of 100 meters and a hub height of 80 meters. Brady II Wind Energy Center ranks as the 12th largest wind farm in North Dakota out of 27, and 484th nationally out of 734.
The plant's latest annual generation was 640,497 MWh, resulting in a capacity factor of 48.8%. The facility operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region. Financial data indicates a power purchase agreement (PPA) price of $25.33 per MWh, as reported to FERC.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Southwest Power Pool
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
65.5K MWh
Latest Month
640.5K MWh
Annual Generation
48.8%
Capacity Factor
$25.3/MWh
PPA Price
Brady Wind II, LLC
Contract Seller
Per-Unit Cost Trends
Market Position
ISO/RTO Market
SPP
LMP Node
WAUE.BEPM.BRADY2
Pricing Hub
SPP North Hub
Node Source
Curated node match
Tax breaks vs. renewable energy offsets: Democrats plan to duel over conflicting Colorado data center bills
This is the Colorado legislature's latest attempt to regulate the controversial sector that forms the backbone of daily digital life.
U.S. emissions rise in 2025 as coal and power demand grow
U.S. greenhouse gas emissions rose 2.4% in 2025 as coal power rebounded, data centers boosted demand and cold weather increased heating,...
U.S. carbon emissions were falling. Why did they go up in 2025?
The rise comes even before the Trump administration's pro-fossil fuel policies fully take hold, the authors of a Rhodium Group analysis...
A tribe in Arizona planned to connect 600 homes to electricity. Then the funding was cut
The Hopi Tribe received a multimillion-dollar federal grant to install solar panels and battery storage systems for hundreds of homes.
Last updated 2026-03-14
View all 10 articles