150 MW Wind operating in McDonough, IL — Midcontinent Independent Transmission System Operator, Inc..
150 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2020
Operating Since
Coordinates
40.6168, -90.7591
County
McDonough, IL
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cardinal Point LLC | Capital Power | — |
| Owner(s) | Cardinal Point LLC | Capital Power Corp [100%] | — |
| Status | Operating | operating | — |
Cardinal Point Wind is a 150 MW wind power plant located in McDonough County, Illinois. The facility, owned and operated by Cardinal Point LLC, commenced operations in 2020. It utilizes a single generator consisting of onshore wind turbines. The plant connects to the grid within the Midcontinent Independent Transmission System Operator (MISO) balancing authority, in the Midwest Reliability Organization (MRO) NERC region.
The wind farm's turbines have a hub height of 89 meters and a rotor diameter of 127 meters. The turbines were manufactured by GE Wind, model GE2.5-127. In its most recent year of operation, Cardinal Point Wind generated 510,280 MWh of electricity, achieving a capacity factor of 38.9%. Cardinal Point Wind ranks as the 34th largest out of 44 wind plants in Illinois, and 496th nationally out of 734 wind plants.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
57.4K MWh
Latest Month
510.3K MWh
Annual Generation
38.9%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ILLINOIS.HUB
Node Source
OSM spatial match
Surprising $1 Damage Award Pushes Boldt v Black & Veatch Into Overtime
The jury awarded Black & Veatch one solitary dollar. That has sent the already five-year-long lawsuit over the 150-MW Cardinal Point wind farm into the...
SERC Board of Directors Briefs: June 23, 2022
SERC's Board of Directors approved the organization's 2023 business plan and budget, along with hearing updates on the region's summer outlook.
Another Wind Farm Possible in Western Illinois
Another company is interested in building a wind farm in western Illinois. Germany-based RWE Renewables hopes to place 48 to 66 turbines in...
Capital Power agrees 100MW Texas wind deal
Canadian energy company Capital Power Corporation has entered into an agreement to acquire the over 100MW Buckthorn wind farm in the US...
Last updated 2026-03-14
View all 5 articles