4.5 MW Wind operating in Kent, RI — ISO New England Inc.
4.5 MW
Nameplate Capacity
3
Generators
units
Onshore Wind Turbine
Technology
2016
Operating Since
Coordinates
41.6725, -71.7058
County
Kent, RI
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | WED Coventry Two, LLC | — | — |
| Owner(s) | Town of West Warwick | — | — |
| Status | Operating | — | — |
WED Coventry 2 is a 4.5 MW wind power plant located in Kent County, Rhode Island. The facility, which began operating in 2016, is owned and operated by WED Coventry Two, LLC. It consists of three onshore wind turbines and ranks as the third-largest of 20 wind plants in the state, and 1232nd nationally out of 1424 wind plants.
The plant utilizes Vensys82 wind turbines manufactured by Vensys, each with a rotor diameter of 82.3 meters and a hub height of 85 meters. In its most recent year of operation, WED Coventry 2 generated 10,339 MWh of electricity, achieving a capacity factor of 26.2%. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
620 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.2K MWh
Latest Month
10.3K MWh
Annual Generation
26.2%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
4005
Pricing Hub
.Z.RHODEISLAND
Node Source
EIA-860 direct report