4.5 MW Wind operating in Van Wert, OH — PJM Interconnection, LLC
4.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2012
Operating Since
Coordinates
40.9135, -84.5641
County
Van Wert, OH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cooper Hatchery Inc. | — | — |
| Owner(s) | Cooper Hatchery Inc. | — | — |
| Status | Operating | — | — |
The Cooper Farms VW Project is a 4.5 MW wind power plant located in Van Wert County, Ohio. The plant began operating in 2012 and is owned and operated by Cooper Hatchery Inc. It utilizes a single onshore wind turbine manufactured by Goldwind, model GW87, with a rotor diameter of 87 meters and a hub height of 85 meters. The plant is interconnected to the grid within the PJM Interconnection, LLC balancing authority.
In its most recent year of operation, the Cooper Farms VW Project generated 12,755 MWh of electricity, achieving a capacity factor of 32.3%. The plant is ranked as the 16th largest wind facility out of 24 in the state of Ohio, and 1240th out of 1424 nationally. The plant operates within the RFC NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Industrial
Sector
Industrial Non-CHP
1.5K MWh
Latest Month
12.8K MWh
Annual Generation
32.3%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Maddox Creek Substation · 345 kV
Substation Distance
2.161 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
NVANWERT69 KV VAN
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match