1.5 MW Solar operating in San Bernardino, CA — California Independent System Operator
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
34.5128, -117.3872
County
San Bernardino, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | AES Distributed Energy | — |
| Owner(s) | AES Distributed Energy | — | — |
| Status | Operating | operating | — |
Victor Mesa Linda B2 is a 1.5 MW solar photovoltaic power plant located in San Bernardino County, California. The plant began operating in 2014 and has one generator. It is owned and operated by AES Distributed Energy. The plant utilizes a fixed tilt solar tracking system.
The plant's latest annual generation was 3,543 MWh, resulting in a capacity factor of 26.9%. Victor Mesa Linda B2 operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant ranks 655th in size among California power plants and 5917th nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
185 MWh
Latest Month
3.5K MWh
Annual Generation
26.9%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
VICTOR_1_N134
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match