1.5 MW Solar operating in San Benito, CA — California Independent System Operator
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
36.8625, -121.4289
County
San Benito, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ecos Energy LLC | Hollister Solar | — |
| Owner(s) | Ecos Energy LLC | — | — |
| Status | Operating | operating | — |
Hollister Solar LLC is a 1.5 MW solar photovoltaic power plant located in San Benito County, California. The plant began operating in 2014 and is owned and operated by Ecos Energy LLC. It consists of a single generator utilizing single-axis tracking technology. The plant's primary fuel source is solar energy.
In the most recent year of data, Hollister Solar generated 3,734 MWh of electricity, achieving a capacity factor of 28.3%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Hollister Solar ranks as the 654th largest solar plant in California out of 862, and 5903rd nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
21 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
177 MWh
Latest Month
3.7K MWh
Annual Generation
28.3%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
HOLLISTR_1_N101
Pricing Hub
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match