1.5 MW Solar operating in Otero, CO — Western Area Power Administration - Rocky Mountain Region
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
37.9835, -103.5762
County
Otero, CO
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pivot Energy | Pivot Energy | — |
| Owner(s) | Pivot Energy | Pivot Energy | — |
| Status | Operating | operating | — |
GEM identifies the owner as Pivot Energy
This entity is not yet in the GEM ownership database — chain unavailable.
BH CSG 3 is a 1.5 MW solar photovoltaic power plant located in Otero County, Colorado. The plant began operating in 2023 and has a single generator. Pivot Energy is the owner and operator. The plant utilizes single-axis tracking to maximize solar energy capture. BH CSG 3 is interconnected to the Western Area Power Administration - Rocky Mountain Region balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, BH CSG 3 generated 4,114 MWh of electricity, achieving a capacity factor of 31.2%. The plant is ranked as the 149th largest solar facility in Colorado out of 177, and nationally it is ranked 5,879th out of 7,108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Western Area Power Administration - Rocky Mountain Region
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
213 MWh
Latest Month
4.1K MWh
Annual Generation
31.2%
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.