5 MW Solar operating in Barnstable, MA — ISO New England Inc.
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
41.6948, -70.1439
County
Barnstable, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Clean Focus Yield, LLC | Clean Focus Yield | — |
| Owner(s) | Clean Focus Yield, LLC | — | — |
| Status | Operating | operating | — |
The Dennis Landfill solar photovoltaic plant is located in Barnstable County, Massachusetts. The plant has a total capacity of 5 MW and began operating in 2014. It is owned and operated by Clean Focus Yield, LLC. The plant utilizes a single generator and fixed-tilt solar tracking technology.
The Dennis Landfill plant operates within the ISO New England Inc. balancing authority and the NPCC NERC region. In its most recent year of operation, the plant generated 7,873 MWh of electricity, achieving a capacity factor of 17.9%. The plant is ranked 31st out of 435 solar facilities in Massachusetts and 3015th out of 7108 solar facilities nationally. The primary fuel source for the plant is solar energy (SUN).
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
23 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
328 MWh
Latest Month
7.9K MWh
Annual Generation
17.9%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Lothrop Avenue Substation · 115 kV
Substation Distance
3.691 km
Operator
National Grid
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.HARWICH 23
Pricing Hub
.H.INTERNAL_HUB
Node Source
Curated node match