4 MW Solar operating in Barnstable, MA — ISO New England Inc.
4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2014
Operating Since
Coordinates
41.6956, -70.0975
County
Barnstable, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Clean Focus Yield, LLC | Clean Focus Yield | — |
| Owner(s) | Clean Focus Yield, LLC | — | — |
| Status | Operating | operating | — |
Harwich Landfill is a 4 MW solar photovoltaic power plant located in Barnstable County, Massachusetts. The plant began operating in 2014 and has a single generator. Clean Focus Yield, LLC is the owner and operator. The plant utilizes fixed-tilt solar tracking technology. It ranks 66th in size among solar plants in Massachusetts and 3429th nationally.
The plant's primary fuel source is solar energy. In the most recent year of data, Harwich Landfill generated 5,713 MWh of electricity, achieving a capacity factor of 16.3%. The plant is located within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
23 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
206 MWh
Latest Month
5.7K MWh
Annual Generation
16.3%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Lothrop Avenue Substation · 115 kV
Substation Distance
1.148 km
Operator
National Grid
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.HARWICH 23
Pricing Hub
.H.INTERNAL_HUB
Node Source
Curated node match