2 MW Solar operating in Yolo, CA — California Independent System Operator
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2013
Operating Since
Coordinates
38.5003, -121.6942
County
Yolo, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Yolo County of | Yolo County of | — |
| Owner(s) | Yolo County of | — | — |
| Status | Operating | operating | — |
The Grassland 3&4 Solar Project is a 2 MW solar photovoltaic power plant located in Yolo County, California. The plant began operating in 2013 and has one generator. It is owned and operated by Yolo County of. The facility utilizes dual-axis solar tracking technology to maximize energy capture.
The plant's output is delivered to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region. According to state rankings, the Grassland 3&4 Solar Project is the 511th largest solar facility in California out of 862 plants. Nationally, it ranks as the 4746th largest solar plant out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Municipal
Sector
IPP Non-CHP
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
UC Davis Substation · 115 kV
Substation Distance
< 10 km
Operator
Pacific Gas and Electric Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_NP15_GEN-APND
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.