200 MW Wind operating in Cameron, TX — Electric Reliability Council of Texas, Inc.
200 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2012
Operating Since
Coordinates
26.3500, -97.6841
County
Cameron, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Duke Energy Renewables Services | — | — |
| Owner(s) | Duke Energy Renewables Services | — | — |
| Status | Operating | — | — |
Los Vientos Wind 1A is a 200 MW wind power plant located in Cameron County, Texas. The plant began operating in 2012 and utilizes onshore wind turbine technology. It consists of one generator and is operated by Duke Energy Renewables Services. The facility's turbines are manufactured by Siemens, model SWT-2.3-108, with a rotor diameter of 108 meters and a hub height of 98.1 meters.
The plant's latest annual generation was 408,298 MWh, resulting in a capacity factor of 23.4%. Los Vientos Wind 1A operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. It ranks 99th out of 200 wind plants in Texas and 305th out of 734 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
20.6K MWh
Latest Month
408.3K MWh
Annual Generation
23.4%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Trees Substation · 138 kV
Substation Distance
1.695 km
Operator
Duke Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
LV1A_LV1B
Pricing Hub
HB_SOUTH
Secondary Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match
Panama generates 75% of its power from renewables: Who are the companies behind it?
Hydropower remains the backbone of Panama's electricity system, while private developers dominate installed capacity.
A new South Texas data center will rely on untapped renewable energy
The new data center will work directly with a nearby windfarm to use energy the windfarm can't send to the state's electricity grid.
Heavy Hail Hammers North Texas; Winds Rip Roofs, Flip Trucks
Severe storms swept across North Texas Sunday, pounding towns like Sanger and Jean with heavy hail and winds that knocked out power to...
Soluna Breaks Ground on Wind-Powered Data Center
Soluna Holdings has broken ground on Project Kati, a data center in Willacy County, Texas, in the southern part of the state in the Rio...
Last updated 2026-03-14
View all 10 articles