201.6 MW Wind operating in Cameron, TX — Electric Reliability Council of Texas, Inc.
201.6 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2012
Operating Since
Coordinates
26.3218, -97.5861
County
Cameron, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Duke Energy Renewables Services | — | — |
| Owner(s) | Duke Energy Renewables Services | — | — |
| Status | Operating | — | — |
Los Vientos Wind 1B is a 201.6 MW wind power plant located in Cameron County, Texas. The plant began operating in 2012 and is operated by Duke Energy Renewables Services. It utilizes onshore wind turbine technology, consisting of a single generator. The facility is interconnected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority.
The plant's wind turbines have a hub height of 90 meters and a rotor diameter of 102 meters. The turbines were manufactured by Mitsubishi, model MWT102/2.4. In the most recent year of reported data, Los Vientos Wind 1B generated 370,330 MWh, achieving a capacity factor of 21.1%. The plant ranks 91st out of 200 wind facilities in Texas and 266th out of 734 wind facilities nationally.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
19.3K MWh
Latest Month
370.3K MWh
Annual Generation
21.1%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
ThePalm Substation · 138 kV
Substation Distance
< 10 km
Operator
Duke Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_SOUTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Texas Nature & Energy Project
How Texas can build large renewable energy projects the right way.
A new South Texas data center will rely on untapped renewable energy
The new data center will work directly with a nearby windfarm to use energy the windfarm can't send to the state's electricity grid.
Heavy Hail Hammers North Texas; Winds Rip Roofs, Flip Trucks
Severe storms swept across North Texas Sunday, pounding towns like Sanger and Jean with heavy hail and winds that knocked out power to...
Soluna Breaks Ground on Wind-Powered Data Center
Soluna Holdings has broken ground on Project Kati, a data center in Willacy County, Texas, in the southern part of the state in the Rio...
Last updated 2026-03-26
View all 10 articles