198 MW Wind operating in Young, TX — Electric Reliability Council of Texas, Inc.
198 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2011
Operating Since
Coordinates
33.4053, -98.6734
County
Young, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Trinity Hills Wind Farm LLC | BP | — |
| Owner(s) | Texas Wind Repower HoldCo, L.P. c/o Concord Infrastructure Investments, LLC, UBS Asset Management (Americas) Inc | Ares Management | — |
| Status | Operating | retired | — |
Trinity Hills is a 198 MW wind power plant located in Young County, Texas. The plant began operating in 2011 and is owned by Ares Management, with Trinity Hills Wind Farm LLC as the listed operator per the EIA. The facility consists of a single generator utilizing onshore wind turbine technology. It is connected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and resides within the TRE NERC region.
The wind farm utilizes Vestas V110-2.2 turbines, characterized by a rotor diameter of 110 meters and a hub height of 80 meters. In its most recent year of operation, Trinity Hills generated 767,441 MWh of electricity, achieving a capacity factor of 44.2%. The plant is ranked as the 113th largest in Texas out of 200 facilities and 372nd nationally out of 734.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
77.4K MWh
Latest Month
767.4K MWh
Annual Generation
44.2%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
Shared substation inference
Last updated 2026-03-14