600 MW Batteries (300 MW) + Solar Photovoltaic (300 MW) planned in Archer, TX — Electric Reliability Council of Texas, Inc.
600 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
33.5649, -98.6120
County
Archer, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Vesper Energy Development LLC | Vesper Energy | — |
| Owner(s) | Vesper Energy Development LLC | Vesper Energy | — |
| Status | Planned | announced | — |
GEM identifies the owner as Vesper Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Red Hollow Renewable Energy is a 600 MW hybrid power plant located in Archer County, Texas. The facility, owned and operated by Vesper Energy Development LLC, combines solar photovoltaic generation with battery storage. It utilizes a fixed tilt solar tracking system. The plant's primary fuel is listed as MWH, reflecting its reliance on renewable energy sources and energy storage.
Red Hollow Renewable Energy operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the Texas Reliability Entity (TRE) NERC region. It is ranked as the 14th largest power plant in Texas out of 224 facilities and holds the 43rd position nationally out of 514 plants. The plant consists of 2 generators.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
Bowman-GarveyRd345
Pricing Hub
HB_NORTH
Node Source
EIA-860 direct report
Red Flag Warning: Grant; Kay; Garfield; Noble; Blaine; Kingfisher; Logan; Payne; Caddo; Canadian; Oklahoma; Lincoln; G
Red Flag Warning issued March 21 at 12:09PM CDT until March 22 at 9:00PM CDT by NWS Norman OK
French-Omani group to build 120MW wind farm
Oman has selected a French-Omani consortium to build a 120-megawatt wind power plant costing OMR50 million ($130 million)
Katy homeowners stopped a battery project, now the developer wants the state to overrule them
Tags: local land-use dispute, Katy, Ochoa Energy, Vesper Energy, Ochoa Energy Storage, Katy High School, Katy City Council. KATY, Texas...
Katy homeowners stopped a battery project, now the developer wants the state to overrule them
Tags: local land-use dispute, Katy, Ochoa Energy, Vesper Energy, Ochoa Energy Storage, Katy High School, Katy City Council. KATY, Texas...
Last updated 2026-03-21