20 MW Solar operating in Fresno, CA — California Independent System Operator
20 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2011
Operating Since
Coordinates
36.5241, -120.1231
County
Fresno, CA
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pacific Gas & Electric Co. | Pacific Gas and Electric | — |
| Owner(s) | Pacific Gas & Electric Co. | PG&E | — |
| Status | Operating | operating | — |
Stroud Solar Station is a 20 MW solar photovoltaic power plant located in Fresno County, California. The plant, which began operating in 2011, utilizes fixed-tilt solar tracking technology. It is owned and operated by Pacific Gas & Electric Co. (PG&E). Stroud Solar Station is connected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
The plant's latest annual generation was 21,268 MWh, resulting in a capacity factor of 12.1%. According to available data, the installed cost of the plant was $3,083.64 per kW. Stroud Solar Station ranks as the 147th largest solar plant in California out of 862, and 1457th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
GRAHAM - WESTLANDS PROJECT
0 MWh
Latest Month
21.3K MWh
Annual Generation
12.1%
Capacity Factor
$3,155/kW
Installed Cost
PACIFIC GAS AND ELECTRIC COMPANY
Reporting Utility
Cumulative Installed Cost
Per-Unit Cost Trends
Market Position
ISO/RTO Market
CAISO
LMP Node
STROUD_6_N003
Pricing Hub
TH_NP15_GEN-APND
Secondary Zone
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
EIA-860 direct report
GRAHAM SOLAR FARM I