10 MW Solar operating in Kent, DE — PJM Interconnection, LLC
10 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2011
Operating Since
Coordinates
39.1863, -75.5060
County
Kent, DE
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Arevon Energy, Inc. | Arevon Energy, Inc. | — |
| Owner(s) | Arevon Energy, Inc. | — | — |
| Status | Operating | operating | — |
Dover Sun Park is a 10 MW solar photovoltaic power plant located in Kent County, Delaware. The plant began operating in 2011 and has a single generator. It is owned and operated by Arevon Energy, Inc. The facility utilizes single-axis tracking to maximize solar energy capture. Dover Sun Park is connected to the PJM Interconnection, LLC balancing authority and is within the RFC NERC region.
In its most recent year of operation, Dover Sun Park generated 12,004 MWh of electricity, resulting in a capacity factor of 13.7%. The plant ranks as the 4th largest of 22 solar facilities in Delaware, and 1845th nationally out of 7108 plants. Financial data is available for the plant from LBNL, suggesting public information on the plant's installed cost and/or power purchase agreement (PPA) price.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
404 MWh
Latest Month
12.0K MWh
Annual Generation
13.7%
Capacity Factor
$189.6/MWh
LCOE (Levelized Cost)
$30.1/MWh
Energy Value
Market Position
ISO/RTO Market
PJM
LMP Node
GARRISON CC
Pricing Hub
WESTERN HUB
Location Type
AGGREGATE
Node Source
Curated node match
Community solar project breaks ground in Harrington
Project Crestone will preserve 25 acres of land and generate enough energy to power more than 500 households, according to Chaberton Energy.
Mega solar park to be built on Smyrna area farms. Farmers want land preserved for crops.
To meet state requirements for renewable energy, more solar parks are planned, sparking a debate about whether they should be built on...
Dover agrees to buy power from large solar arrays planned for Delaware
The City of Dover plans to buy power from a pair of solar projects expected to be the biggest in the state to date. The 50-megawatt Raceway...
Garrison Energy Center combined-cycle gas-fired facility, Dover, Delaware
Garrison Energy Center is a 309MW combined-cycle gas-fired electric generating facility located adjacent to the existing Dover SUN Park.
Last updated 2026-03-14
View all 6 articles