4.5 MW Wind operating in Barnstable, MA — ISO New England Inc.
4.5 MW
Nameplate Capacity
3
Generators
units
Onshore Wind Turbine
Technology
2009
Operating Since
Coordinates
41.6647, -70.5942
County
Barnstable, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Air Force Civil Engineer Center | — | — |
| Owner(s) | Air Force Civil Engineer Center | — | — |
| Status | Operating | — | — |
The MA Military Reservation Wind Project is a 4.5 MW wind power plant located in Barnstable County, Massachusetts. The facility, which began operating in 2009, is owned and operated by the Air Force Civil Engineer Center. It consists of three onshore wind turbines. The plant ranks 6th out of 21 wind facilities in Massachusetts and 1228th out of 1424 nationally.
The wind farm utilizes GE Wind GE1.5-77 turbines, each with a rotor diameter of 77 meters and a hub height of 80 meters. In its most recent year of operation, the plant generated 9,693 MWh of electricity, achieving a capacity factor of 24.5%. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
23 kV
Regulatory Status
NR
Entity Type
Federal
Sector
IPP Non-CHP
688 MWh
Latest Month
9.7K MWh
Annual Generation
24.5%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.H.INTERNAL_HUB
Node Source
OSM spatial match