150 MW Wind operating in Story, IA — Midcontinent Independent Transmission System Operator, Inc..
150 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2008
Operating Since
Coordinates
42.1044, -93.2722
County
Story, IA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | FPL Energy Story Wind LLC | — | — |
| Owner(s) | FPL Energy Story Wind LLC | — | — |
| Status | Operating | — | — |
FPL Energy Story Wind LLC is a 150 MW wind power plant located in Story County, Iowa. The plant, which began operating in 2008, is owned and operated by FPL Energy Story Wind LLC. It utilizes a single generator consisting of onshore wind turbines. The facility is interconnected to the Midcontinent Independent Transmission System Operator (MISO) and is situated within the MRO NERC region.
The plant's wind turbines have a hub height of 80 meters and a rotor diameter of 87 meters. The turbines were manufactured by GE Wind, and the model used is GE1.5-87. In its most recent year of operation, the plant generated 537,834 MWh of electricity, achieving a capacity factor of 41.0%. FPL Energy Story Wind LLC ranks as the 42nd largest power plant in Iowa out of 54, and 491st nationally out of 734 plants.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
60.6K MWh
Latest Month
537.8K MWh
Annual Generation
41.0%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Story County I Wind Energy Center · 161 kV
Substation Distance
0.759 km
Operator
NextEra Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
ALTW.AMESWIND
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match
NextEra (NEE) Anticipates Adding up to 30 Gigawatts of Power for Data Centers by 2035
On March 3, 2026, Reuters reported that NextEra Energy, Inc. (NYSE:NEE) plans to install between 15 and 30 gigawatts of new power generation...
NextEra (NEE) Anticipates Adding up to 30 Gigawatts of Power for Data Centers by 2035
On March 3, 2026, Reuters reported that NextEra Energy, Inc. (NYSE:NEE) plans to install between 15 and 30 gigawatts of new power generation...
NextEra (NEE) Anticipates Adding up to 30 Gigawatts of Power for Data Centers by 2035
On March 3, 2026, Reuters reported that NextEra Energy, Inc. (NYSE:NEE) plans to install between 15 and 30 gigawatts of new power generation...
NextEra (NEE) Anticipates Adding up to 30 Gigawatts of Power for Data Centers by 2035
On March 3, 2026, Reuters reported that NextEra Energy, Inc. (NYSE:NEE) plans to install between 15 and 30 gigawatts of new power generation...
Last updated 2026-03-14