2 MW Wind operating in Pipestone, MN — Midcontinent Independent Transmission System Operator, Inc..
2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2003
Operating Since
Coordinates
44.0209, -96.1184
County
Pipestone, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | K-brink Windfarm, LLC | — | — |
| Owner(s) | K-brink Windfarm, LLC | — | — |
| Status | Operating | — | — |
K-Brink Windfarm LLC is a 2 MW wind power plant located in Pipestone County, Minnesota. The facility, which began operating in 2003, consists of a single onshore wind turbine generator. It is owned and operated by K-brink Windfarm, LLC. The plant's location places it within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the Midwest Reliability Organization (MRO) NERC region.
In its most recent year of operation, K-Brink Windfarm generated 3,324 MWh of electricity, achieving a capacity factor of 19.0%. In terms of size, the plant is ranked 81st out of 123 wind facilities in Minnesota, and 1305th nationally out of 1424 wind plants.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
517 MWh
Latest Month
3.3K MWh
Annual Generation
19.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
MISO
Pricing Hub
MINN.HUB