51.4 MW Natural Gas operating in San Diego, CA — California Independent System Operator
51.4 MW
Nameplate Capacity
2
Generators
units
Natural Gas Fired Combined Cycle
Technology
1994
Operating Since
Coordinates
33.1185, -117.0992
County
San Diego, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Goal Line LP | Goal Line | — |
| Owner(s) | Goal Line LP | Onward Energy Holdings | — |
| Status | Operating | — | — |
Goal Line LP is a 51.4 MW natural gas-fired combined cycle power plant located in San Diego County, California. The plant began operating in 1994 and has two generators. It is owned by Onward Energy Holdings and operated by Goal Line LP. The plant is within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
In the most recent year with available data, Goal Line LP generated 7,397 MWh of electricity, resulting in a capacity factor of 1.6%. The plant ranks 105th in size among California's 297 power plants and 1097th nationally out of 1963 plants.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP CHP
0 MWh
Latest Month
7.4K MWh
Annual Generation
1.6%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Goal Line
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
GOALLINE_6_N001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
EIA-860 direct report
Last updated 2026-03-26
View all 6 articles