15 MW Hydro operating in Fairfield, SC — Dominion Energy South Carolina
15 MW
Nameplate Capacity
6
Generators
units
Conventional Hydroelectric
Technology
1914
Operating Since
Coordinates
34.2612, -81.3310
County
Fairfield, SC
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Dominion Energy South Carolina, Inc | Dominion Energy South Carolina | — |
| Owner(s) | Dominion Energy South Carolina, Inc | Dominion Energy | — |
| Status | Operating | — | — |
Parr Hydro is a 15 MW hydroelectric power plant located in Fairfield County, South Carolina. The plant began operating in 1914 and consists of 6 generators utilizing conventional hydroelectric technology. It is owned and operated by Dominion Energy South Carolina, Inc., a subsidiary of Dominion Energy. Parr Hydro is within the Dominion Energy South Carolina balancing authority and the SERC NERC region.
In the most recent year with available data, Parr Hydro generated 51,081 MWh of electricity, achieving a capacity factor of 38.8%. The plant is fueled by water (WAT). According to available data, the installed cost was $957.52 per kW. Parr Hydro is ranked as the 15th largest hydroelectric plant in South Carolina out of 33, and 556th nationally out of 1464 plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Dominion Energy South Carolina
Grid Voltage
13.8 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
5.5K MWh
Latest Month
51.1K MWh
Annual Generation
38.8%
Capacity Factor
$1,451/kW
Installed Cost
$43.9/MWh
Operating Cost
South Carolina Electric & Gas Company
Reporting Utility
Cumulative Installed Cost
Per-Unit Cost Trends
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Dominion Energy delivers first power from Coastal Virginia Offshore Wind project (D:NYSE)
Dominion Energy's 2.6 GW Coastal Virginia Offshore Wind project has reached first power, with the project's first turbine generating power...
Dominion Energy delivers first power from Coastal Virginia Offshore Wind project (D:NYSE)
Dominion Energy's 2.6 GW Coastal Virginia Offshore Wind project has reached first power, with the project's first turbine generating power...
Campbell County leaders approve solar farm site off Brookneal Highway
CAMPBELL COUNTY, Va. (WSET) — The Campbell County Board of Supervisors voted 6-1 to allow Dominion Energy to build a solar farm off...
Virginia gas plant moves ahead despite community objections | Energy
Tense public hearings and protests mocking Dominion Energy have followed the proposed natural gas plant in Chesterfield County, VA,...
Last updated 2026-03-26
View all 10 articles