15 MW Hydro operating in St Lawrence, NY — New York Independent System Operator
15 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1957
Operating Since
Coordinates
44.5065, -74.7534
County
St Lawrence, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Erie Boulevard Hydropower LP | — | — |
| Owner(s) | Erie Boulevard Hydropower LP | — | — |
| Status | Operating | — | — |
The Blake hydroelectric plant, located in St. Lawrence County, New York, has a total capacity of 15 MW. The plant began operating in 1957 and utilizes conventional hydroelectric technology. It is owned and operated by Erie Boulevard Hydropower LP. Blake is connected to the New York Independent System Operator (NYISO) balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region.
Blake's primary fuel source is water (WAT). In the most recent year of data, the plant generated 64,945 MWh of electricity, achieving a capacity factor of 49.3%. The plant ranks 30th out of 165 power plants in New York state, and 553rd out of 1464 plants nationally. The plant has one generator.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
5.0K MWh
Latest Month
64.9K MWh
Annual Generation
49.3%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
UPPER RAQUET___HYD
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
24056
Pricing Hub
NYISO Zone E
Node Source
EIA-860 direct report
Brace for THOUSANDS more in energy costs — unless Albany fixes NY’s insane climate law
Critics, including us, have been warning that New Yorkers' energy costs are about to soar even higher, thanks to the state's insane 2019...
For $300, would you give National Grid control over your thermostat?
Gov. Kathy Hochul wants your household to become part of a “virtual power plant” to help ease strain on the electric grid.
Jackson Blake’s overtime goal lifts Hurricanes past Rangers 3-2
Jackson Blake's power-play goal on a deflection 4:47 into overtime lifted the Carolina Hurricanes to a 3-2 win over the New York Rangers on...
NYS Budget Director on change in projections, child care, federal and Mamdani impacts
With the New York State FY2027 Executive Budget due in a little more than a month, New York State Budget Director Blake Washington joined...
Last updated 2026-03-14
View all 10 articles