Aurelius 3 Solar — Project Summary

Queue ID
ERCOT-29INR0011
Capacity
445.4 MW
Technology
Solar
Status
active
Location
Deaf Smith, TX
Region
ERCOT
Developer
IP Roman III, LLC
IA Status
Facility Study

Aurelius 3 Solar

BetaActiveSolarERCOTLBNL + Live

445.4 MW generation in Deaf Smith, TX · In queue since December 2023 · Proposed COD March 2029

445.4 MW

Capacity

1

Components

Solar

2y 3m

In Queue

Facility Study

IA Status

COD target: 2029

Interconnection Timeline

Total Duration

5y 3m

Facilities Study50%
Queue EntryDec 4, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-03-31

Project Details

State

TX

County

Deaf Smith

Region

ERCOT

Developer

IP Roman III, LLC

Utility

Entity

ERCOT

Point of Interconnection

23908 Deaf Smith station 345 kV. This INR has a 600 MW PUN load at the medium voltage side of the MPTs for a total of 1800 MW PUN load (refer to the substation SLD).

Data Source

LBNL + Live

No news available for this project.