Black Hawk Solar
251.34 MW generation in Duval, TX · In queue since February 2024 · Proposed COD December 2028
251.34 MW
Capacity
1
Components
Solar
2y 1m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
4y 10m
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-31
State
TX
County
Duval
Region
ERCOT
Developer
ACE DevCo NC, LLC
Utility
—
Entity
ERCOT
Point of Interconnection
San Miguel (5901) - Cruce (80079) double circuit transmission line. Requesting interconnection to both lines on the double circuit. This is a planned double circuit with ISD of 2027.
Data Source
LBNL + Live