Black Hawk Solar — Project Summary

Queue ID
ERCOT-28INR0040
Capacity
251.34 MW
Technology
Solar
Status
active
Location
Duval, TX
Region
ERCOT
Developer
ACE DevCo NC, LLC
IA Status
Facility Study

Black Hawk Solar

BetaActiveSolarERCOTLBNL + Live

251.34 MW generation in Duval, TX · In queue since February 2024 · Proposed COD December 2028

251.34 MW

Capacity

1

Components

Solar

2y 1m

In Queue

Facility Study

IA Status

COD target: 2028

Interconnection Timeline

Total Duration

4y 10m

Facilities Study50%
Queue EntryFeb 27, 2024

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

Project Details

State

TX

County

Duval

Region

ERCOT

Developer

ACE DevCo NC, LLC

Utility

Entity

ERCOT

Point of Interconnection

San Miguel (5901) - Cruce (80079) double circuit transmission line. Requesting interconnection to both lines on the double circuit. This is a planned double circuit with ISD of 2027.

Data Source

LBNL + Live

No news available for this project.