Ophelia Solar
110.5 MW generation in Ector, TX · In queue since September 2022 · Proposed COD September 2028
110.5 MW
Capacity
1
Components
Solar
3y 6m
In Queue
Facility Study
IA Status
COD target: 2028
Total Duration
6 years
Interconnection request submitted to ISO/RTO
ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.
Typical: 18–30 months (fastest major ISO)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-19
State
TX
County
Ector
Region
ERCOT
Developer
Ophelia Solar
Utility
—
Entity
ERCOT
Point of Interconnection
Tapping the 138 kV Line from Moss Switch (Bus# 1019) to Shin Oak POD (Bus# 11128). The project has a 110 MW PUN load at the high side of the MPT (refer to the substation SLD).
Data Source
LBNL + Live