Raspberry Solar 1
16.5 MW generation in Contra Costa, CA · In queue since April 2023 · Proposed COD July 2026
16.5 MW
Capacity
1
Components
Solar
2y 11m
In Queue
Not Started
IA Status
COD target: 2026
Total Duration
3y 3m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-07-01
State
CA
County
Contra Costa
Region
CAISO
Developer
—
Utility
PGAE
Entity
CAISO
Point of Interconnection
SOBRANTE-STANDARD OIL SW STA #1
Data Source
LBNL
New $42M Grid-Tech Sandbox Will Help Get More Renewables on Electric Grids
A dozen buildings on the University of California San Diego campus. All of the campus' solar panels. All the chargers for electric vehicles.
New $42M Grid-Tech Sandbox Will Help Get More Renewables on Electric Grids
A dozen buildings on the University of California San Diego campus. All of the campus' solar panels. All the chargers for electric vehicles.
Last updated 2026-03-26