TENDRIL
200 MW hybrid in Kern, CA · In queue since April 2023 · Proposed COD December 2031
200 MW
Capacity
2
Components
Solar + Battery
2y 11m
In Queue
Not Started
IA Status
COD target: 2031
Total Duration
8y 8m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-12-31
State
CA
County
Kern
Region
CAISO
Developer
—
Utility
PGAE
Entity
CAISO
Point of Interconnection
ARCO-MIDWAY
Data Source
LBNL
PG&E, Xcel Energy, San José Clean Energy VPPs: US utilities to manage grid constraints with distributed batteries
Three virtual power plant (VPP) programmes have been announced in California and Colorado. Two of them will use Tesla's Powerwall battery.
PG&E, Xcel Energy, San José Clean Energy VPPs: US utilities to manage grid constraints with distributed batteries
Three virtual power plant (VPP) programmes have been announced in California and Colorado. Two of them will use Tesla's Powerwall battery.
PG&E, Xcel Energy, San José Clean Energy VPPs: US utilities to manage grid constraints with distributed batteries
Three virtual power plant (VPP) programmes have been announced in California and Colorado. Two of them will use Tesla's Powerwall battery.
PG&E, Xcel Energy, San José Clean Energy VPPs: US utilities to manage grid constraints with distributed batteries
Three virtual power plant (VPP) programmes have been announced in California and Colorado. Two of them will use Tesla's Powerwall battery.
Last updated 2026-03-26