BlueWater Solar
2,037 MW hybrid in La Paz, AZ · In queue since April 2023 · Proposed COD December 2028
2,037 MW
Capacity
2
Components
Solar + Battery
2y 11m
In Queue
Not Started
IA Status
COD target: 2028
Total Duration
5y 8m
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-29
State
AZ
County
La Paz
Region
CAISO
Developer
—
Utility
DCRT
Entity
CAISO
Point of Interconnection
CIELO AZUL 500 kV
Data Source
LBNL
Bighorn Solar Project, Pueblo, Colorado, US
Bighorn solar project is a 300MW photovoltaic (PV) solar farm developed by Lightsource bp to power the EVRAZ Rocky Mountain steel mill in Pueblo, Colorado, US.
Bighorn Solar Project, Pueblo, Colorado, US
Bighorn solar project is a 300MW photovoltaic (PV) solar farm developed by Lightsource bp to power the EVRAZ Rocky Mountain steel mill in Pueblo, Colorado, US.
Bighorn Solar Project, Pueblo, Colorado, US
Bighorn solar project is a 300MW photovoltaic (PV) solar farm developed by Lightsource bp to power the EVRAZ Rocky Mountain steel mill in Pueblo, Colorado, US.
Bighorn Solar Project, Pueblo, Colorado, US
Bighorn solar project is a 300MW photovoltaic (PV) solar farm developed by Lightsource bp to power the EVRAZ Rocky Mountain steel mill in Pueblo, Colorado, US.
Last updated 2026-03-26