486.5 MW Natural Gas Steam Turbine (446 MW) + Petroleum Liquids (41 MW) operating in St Charles, LA — Midcontinent Independent Transmission System Operator, Inc..
486.5 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Natural Gas Steam Turbine + Petroleum Liquids
1975
Operating Since
Coordinates
29.9989, -90.4768
County
St Charles, LA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Entergy Louisiana LLC | Entergy Louisiana | — |
| Owner(s) | Entergy Louisiana LLC | Entergy | — |
| Status | Operating | — | — |
Waterford 1 & 2 is a 486.5 MW hybrid power plant located in St Charles County, Louisiana. The plant, which began operating in 1975, is owned by Entergy and operated by Entergy Louisiana LLC. It utilizes both natural gas steam turbines and petroleum liquids as fuel sources. The plant consists of two generators.
Waterford 1 & 2 operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. In the most recent year with available data, the plant generated 318,679 MWh, achieving a capacity factor of 7.4%. The plant's installed cost was $222.15 per kW, according to FERC data. Waterford 1 & 2 is ranked as the largest of its kind in Louisiana and 25th nationally out of 60 similar plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
230 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
11.0K MWh
Latest Month
318.7K MWh
Annual Generation
7.4%
Capacity Factor
$276/kW
Installed Cost
$56.6/MWh
Operating Cost
Entergy Louisiana, LLC
Reporting Utility
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Market Position
ISO/RTO Market
MISO
LMP Node
EES.WATRFD2
Pricing Hub
LOUISIANA.HUB
Location Type
Generation Node
Node Source
EIA-860 direct report
Entergy breaks ground on Meta power plants; will ‘reduce customer bills’
Entergy breaks ground on more Meta power plants in north Louisiana.
Entergy Louisiana breaks ground on new, state-of-the-art generation facilities to power reliability, growth and innovation
Posted:Dec 1, 2025 | Posted:Louisiana Team | Category:News release | Tags:Community partnership, Corporate, Data centers, Economic growth, Louisiana,...
Entergy breaks ground on power facility for giant Meta data center
Entergy Louisiana began construction Monday on a pair of gas power plants that will supply electricity for Meta's giant data center.
Entergy Louisiana gets approval to build 3 new combined cycle plants to power huge Meta data center
The Richland Parish data center project, first announced in 2024, is one of the largest private capital investments in Louisiana's history.
Last updated 2026-03-14
View all 10 articles