781.4 MW Natural Gas operating in Washington, MS — Midcontinent Independent Transmission System Operator, Inc..
781.4 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Steam Turbine
Technology
1975
Operating Since
Coordinates
33.3500, -91.1167
County
Washington, MS
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Entergy Mississippi LLC | Entergy Mississippi | — |
| Owner(s) | Entergy Mississippi LLC | Entergy | — |
| Status | Operating | — | — |
The Gerald Andrus plant is a 781.4 MW natural gas-fired power plant located in Washington County, Mississippi. It began operating in 1975 and is owned and operated by Entergy Mississippi LLC, a subsidiary of Entergy. The plant utilizes a single natural gas steam turbine generator. According to available data, the installed cost was $204.24 per kW.
The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. In the most recent year with available data, the Gerald Andrus plant generated 388,516 MWh of electricity, achieving a capacity factor of 5.6%. The plant is ranked as the 11th largest in Mississippi out of 20 plants, and 263rd nationally out of 945 plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
230 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
0 MWh
Latest Month
388.5K MWh
Annual Generation
5.6%
Capacity Factor
$265/kW
Installed Cost
$58.1/MWh
Operating Cost
entergy mississippi, llc
Reporting Utility
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Point of Interconnection
Nearest Substation
Gerald Andrus Station · 230 kV
Substation Distance
< 10 km
Operator
Entergy Mississippi
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
EES.G_ANDRUS1
Pricing Hub
MS.HUB
Node Source
EIA-860 direct report
Delta Blues groundbreaking and Gerald Andrus 50th anniversary
nA groundbreaking ceremony for Entergy Mississippi's newly announced Delta Blues Advanced Power Station was held recently in Greenville…
Officials break ground on new Greenville power plant
Mississippi Public Broadcasting is MPB. Mississippi is Our Mission. Get the latest news on Tate Reeves, the Election and updates on...
Entergy Mississippi Breaks Ground on 754-MW Gas-Fired Power Station
Entergy Mississippi on Nov. 7 celebrated the start of construction of a new $1.2 billion, 754-MW natural gas-fired power plant that will serve the utility's...
Entergy Mississippi breaks ground on Delta Blues Advanced Power Station
The $1.2 billion investment represents a significant economic impact for the Mississippi Delta. By replacing end-of-life gas generation with...
Last updated 2026-03-14