3 MW Solar operating in Fresno, CA — California Independent System Operator
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
36.7500, -119.6500
County
Fresno, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Forefront Power, LLC | — | — |
| Owner(s) | Forefront Power, LLC | — | — |
| Status | Operating | — | — |
Located in Fresno County, California, the City of Fresno - SE Surface WTP is a 3 MW solar photovoltaic power plant. The plant, which began operating in 2025, utilizes a single generator and fixed-tilt solar tracking technology. Forefront Power, LLC is the operator of the facility.
The plant's output is managed within the California Independent System Operator (CAISO) balancing authority, situated in the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant ranks as the 401st largest solar facility in California out of 862, and 4044th nationally out of 7108. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
21 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
OSM spatial match