5 MW Solar operating in Androscoggin, ME — ISO New England Inc.
5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
44.0745, -70.1378
County
Androscoggin, ME
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Hayworth Solar Partners, LLC | — | — |
| Owner(s) | Hayworth Solar Partners, LLC | — | — |
| Status | Operating | — | — |
The MD - EDFR - Phase II - Lewiston solar photovoltaic plant is located in Androscoggin County, Maine. The plant has a total capacity of 5 MW and consists of a single generator. It began operating in 2024 and is owned and operated by Hayworth Solar Partners, LLC. The plant utilizes fixed-tilt solar tracking technology.
The Lewiston facility operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. It is the 31st largest solar plant in Maine out of 153, and ranks 2574th nationally out of 7108 solar plants. The plant's primary fuel source is solar energy (SUN).
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Leeds 115 kV SS - Sturtevant-Leeds-Livermore-Ludden-Riley Area DG Study
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Crowleys Substation · 115 kV
Substation Distance
2.165 km
Operator
Central Maine Power Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.CROWLEYS12.5
Pricing Hub
.Z.MAINE
Node Source
Curated node match