200 MW BESS under construction in —, AZ — Tucson Electric Power Company
200 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
—
Operating Since
Coordinates
32.0730, -100.8210
County
—, AZ
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tucson Electric Power Co | Tucson Electric Power | — |
| Owner(s) | Tucson Electric Power Co | Fortis | — |
| Status | Under construction | — | — |
Roadrunner Reserve Phase 2 is a 200 MW battery energy storage system located in Arizona. The plant, identified by plant ID 68937, is owned by Fortis, a Canadian company, and operated by Tucson Electric Power Co. It consists of a single generator utilizing batteries as its primary fuel source. The plant ranks 34th out of 47 power plants in Arizona and 271st out of 514 nationally.
The facility operates within the Western Electricity Coordinating Council (WECC) NERC region and is under the balancing authority of Tucson Electric Power Company. The plant's primary fuel is electricity (MWH) used to charge the batteries.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
Tucson Electric Power Company
Grid Voltage
138 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
No generation data available for this plant.
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Tucson Electric Power to build another big battery system to meet peak power demand
Tucson Electric Power plans to build a second, large battery system in southeast Tucson to store solar and other energy until later in the day to meet peak...
Key Criteria that Drive Large-Scale Energy Storage Success
A Battery Energy Storage System (BESS) can elevate a utility's fleet, stabilize the supply of electricity, reduce costs, and optimize revenue.
Combining EPC, O&M provider means ‘less downtime, more efficient operations’ for Arizona utility’s biggest BESS
Energy-Storage.news hears how DEPCOM believes offering combined EPC as well as O&M services is a compelling proposition.
Roadrunner Reserve energy storage system to be one of largest in Arizona
Canadian Solar's e-Storage has entered the supply and integration contract for 1 GWh DC of energy storage solutions for DEPCOM Power and...
Last updated 2026-03-26
View all 10 articles