2 MW Solar operating in Peoria, IL — Midcontinent Independent Transmission System Operator, Inc..
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
40.6222, -89.6788
County
Peoria, IL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SolAmerica Energy, LLC | — | — |
| Owner(s) | SolAmerica Energy, LLC | — | — |
| Status | Operating | operating | — |
Peoria County IL S2 is a 2 MW solar photovoltaic power plant located in Peoria County, Illinois. The plant, which began operating in 2025, utilizes a fixed-tilt solar tracking system. It consists of a single generator and is operated by SolAmerica Energy, LLC.
The plant's output is integrated into the grid managed by the Midcontinent Independent Transmission System Operator, Inc. (MISO), a balancing authority within the SERC Reliability Corporation (SERC) NERC region. In terms of size, Peoria County IL S2 is ranked as the 134th largest solar plant in Illinois out of 320, and 4818th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
AMIL.EDWARDS3
Pricing Hub
ILLINOIS.HUB
Location Type
Generation Node
Node Source
Curated node match