2 MW Solar planned in Clinton, NY — New York Independent System Operator
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
44.7116, -73.5413
County
Clinton, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cavern Solar, LLC | — | — |
| Owner(s) | Cavern Solar, LLC | — | — |
| Status | Planned | announced | — |
The Cavern solar photovoltaic plant is located in Clinton County, New York. The plant has a total capacity of 2 MW and consists of a single generator. It is owned and operated by Cavern Solar, LLC. The plant utilizes fixed-tilt solar tracking technology.
Cavern is connected to the New York Independent System Operator (NYISO) balancing authority and is situated within the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, the plant is ranked 523 out of 695 power plants in New York state, and 4877 out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
CLINTON___LFGE
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone D
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.