2 MW Solar operating in Garrett, MD — PJM Interconnection, LLC
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
39.3735, -79.3976
County
Garrett, MD
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | MD CDG 001 LLC | — | — |
| Owner(s) | MD CDG 001 LLC | — | — |
| Status | Operating | operating | — |
MD CDG 001 is a 2 MW solar photovoltaic power plant located in Garrett County, Maryland. The plant began operating in 2024 and has one generator. It is owned and operated by MD CDG 001 LLC. The facility utilizes single-axis tracking technology to maximize solar energy capture.
The plant is connected to the grid within the PJM Interconnection, LLC balancing authority, which is part of the RFC NERC region. In terms of size, MD CDG 001 ranks as the 62nd largest solar plant in Maryland out of 183, and 4896th nationally out of 7108. The plant's primary fuel source is solar energy (SUN).
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
0 MWh
Latest Month
0 MWh
Annual Generation
0.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
WESTERN HUB
Node Source
OSM spatial match