110.4 MW Wind planned in Pecos, TX — Electric Reliability Council of Texas, Inc.
110.4 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
Planned: —
Planned Operation
Coordinates
30.8126, -102.1865
County
Pecos, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenalia Wind Power Blackwelder Ranch, LLC | Greenalia SA | — |
| Owner(s) | Greenalia Wind Power Blackwelder Ranch, LLC | Smarttia | — |
| Status | Planned | announced | — |
Blackwelder Ranch Wind is a 110.4 MW wind power plant located in Pecos County, Texas. The facility consists of a single generator utilizing onshore wind turbine technology. The plant's primary fuel source is wind (WND). It is owned by Smarttia, a company based in Spain, and operated by Greenalia Wind Power Blackwelder Ranch, LLC.
The plant operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority, which falls under the Texas Reliability Entity (TRE) NERC region. Blackwelder Ranch Wind is ranked as the 196th largest power plant in Texas out of 200, and nationally it is ranked 641st out of 734.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
L_MEVISW8_1Y
Pricing Hub
HB_WEST
Node Source
EIA-860 direct report
Fire Weather Watch: Sacramento Foothills and Guadalupe Mountains; Chaves County Plains; Eddy Plains; Lea; Gaines; Dawson
Fire Weather Watch issued March 21 at 2:43AM CDT until March 23 at 12:00AM CDT by NWS Midland/Odessa TX
Last updated 2026-03-21
View all articles