2.1 MW Solar operating in Fresno, CA — California Independent System Operator
2.1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
36.4422, -120.3874
County
Fresno, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Renewable Solar, Inc | — | — |
| Owner(s) | Superior Almond Hulling | — | — |
| Status | Operating | operating | — |
Superior Almond Hulling is a 2.1 MW solar photovoltaic power plant located in Fresno County, California. The plant began operating in 2024 and has one generator. It is owned and operated by Renewable Solar, Inc. The primary fuel source for the plant is solar energy.
The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. As of the latest rankings, Superior Almond Hulling is the 500th largest power plant in California out of 862 plants, and the 4534th largest in the United States out of 7108 plants. The solar panels utilize a fixed tilt tracking system.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Industrial
Sector
Industrial Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_NP15_GEN-APND
Secondary Zone
TH_ZP26_GEN-APND
Node Source
Shared substation inference