89.9 MW Batteries (25 MW) + Solar Photovoltaic (65 MW) planned in Kern, CA — California Independent System Operator
89.9 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
35.7803, -119.9110
County
Kern, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Origis Energy USA, Inc | — | — |
| Owner(s) | Origis Energy USA, Inc | — | — |
| Status | Planned | pre-construction | — |
The Chalan plant is a hybrid solar and battery energy storage facility located in Kern County, California. It is owned and operated by Origis Energy USA, Inc. The plant has a total capacity of 89.9 MW, comprised of solar photovoltaic generation paired with battery storage. The facility utilizes fixed-tilt solar tracking technology.
Chalan is connected to the California Independent System Operator (CAISO) balancing authority and operates within the Western Electricity Coordinating Council (WECC) NERC region. The plant ranks as the 119th largest in California out of 300 facilities and 526th nationally out of 1205. The primary fuel type reported to the Energy Information Administration (EIA) is MWH, reflecting the electricity generated and stored. The plant consists of two generators.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
LSTHLLS_6_N001
Pricing Hub
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
Rotating power outages begin Tuesday night with plants going offline
A new round of rotating power outages started Tuesday night after the Ukudu power plant and Cabras 2 went offline.
CA loses 8L to fake RTO challan app
Rajkot: A 37-year-old chartered accountant from Rajkot has lodged a complaint with the Cyber Crime police station after losing Rs 8 lakh to...
8minute Solar Energy unveil another massive Californian solar plus storage project
8Minute to partner in massive new solar and storage project in California, saying it is cleanest and smartest way to boost grid reliability.
GPA schedules power outages from 1-10pm Friday
The Guam Power Authority announces the following tentative outage schedule for today as needed and is subject to change depending on demand for power.
Last updated 2026-03-14
View all articles